This was a design/build project with Veolia Water, Bowen Engineering, and HNTB.  Toric provided 11 PLC panels for a Supervisory Control and Data Acquisition system in an abbreviated time schedule.

This project was to provide the customer with reuse water pump control panel and interface it with the existing fiber-optic based control system.  This also included Modbus communication to 12 aeration gates.

The purpose for this project was to provide the customer with emergency power backup.  This included installation of automatic transfer switches and generators, and the modification of existing lighting panels. 

The purpose of this project was to provide the customer a control system to pump ice cream and mix to prepare for injection into the cone.

This project was to provide a SCADA system for the City of Greenfield’s new 4 million-gallon-a-day water treatment plant.  This included automatic control of the treatment plant as well as remote control of the well houses through wireless communications.

Veolia White River North Ground Water Treatment Plant

Crossroads Dairy Cone Line

Ray’s Trash Generator Install

South Bend Waste Water Treatment Plant Aeration

Greenfield North Park Water Treatment Plant