This was a design/build project with Veolia Water, Bowen Engineering, and HNTB. Toric provided 11 PLC panels for a Supervisory Control and Data Acquisition system in an abbreviated time schedule. |
|
This project was to provide the customer with reuse water pump control panel and interface it with the existing fiber-optic based control system. This also included Modbus communication to 12 aeration gates. |
|
The purpose for this project was to provide the customer with emergency power backup. This included installation of automatic transfer switches and generators, and the modification of existing lighting panels. |
|
The purpose of this project was to provide the customer a control system to pump ice cream and mix to prepare for injection into the cone. |
|
This project was to provide a SCADA system for the City of Greenfield’s new 4 million-gallon-a-day water treatment plant. This included automatic control of the treatment plant as well as remote control of the well houses through wireless communications. |
|
Veolia White River North Ground Water Treatment Plant |
|
Crossroads Dairy Cone Line |
|
Ray’s Trash Generator Install |
|
South Bend Waste Water Treatment Plant Aeration |
|
Greenfield North Park Water Treatment Plant |




|
Project List |